Yep, after living and working in Indonesia, we still did continue doing consulting work but no longer than 2 or 3 weeks at a time.
So we finally since early May of 1992, could start working on home & garden...
Our contractor left us with a huge mountain of dirt UNDER THE HOUSE!
While we were working/living in Indonesia, he started constructing the house, which Pieter had designed, by making the drawings all himself.
Two levels on the driveway end and one level on the kitchen side.
The contractor did ask if we wanted a wine cellar but we said no, we don't need that.
Not realizing by not wanting that, he also bypassed any concrete flooring...!
Oh dear, when you're not physically present at times; big problems can arise that need to be dealt with later.
Neither was there Internet for quick communication...
Always harder too, for correcting a problem like that later, as you barely can access the area for a fast and efficient excavation.
But we needed to get rid of the musty heap of 60 tons of dirt!
In August of 1991, I've dug out already a big section, as much as we needed to fill in for washed out dirt that Pieter rode then out in the wheelbarrow... See: The FIGHT of Growing Grass in Subtropical Georgia/USA ←click it.
This time, Pieter himself dug out a lot more, as we planned to build our pantry.