Due to extreme heat in summer, here in the South East of the USA, in Georgia, we decided to have us an 87 m (285 feet) deep well dug.
Due to city water restrictions, we had no other option or let our veggies, flowers, plants and shrubs go to waste...
On Monday morning around 8:00 AM on July 15, 1985, they arrived for digging our well...
Pieter was at work but he had already laid all the electric wiring, to the spot where the pump had to be placed.
BUT this man did not listen to me...
I ran quickly inside the house, and grabbed the wireless phone, while I had rang Pieter.
Now I handed the phone to the stubborn man and I heard him say: Yes Sir, sure Sir!
He then handed the phone back to me, and grumbled...
They worked for 7 hours...
A lot of action was going on in our yard...
What a muddy job!
By 15:15 they pulled the switch over and it started running!
This proved, that Pieter had correctly connected the electrical wiring!
The first water starts running out...
Still dirty water, for several hours...
Pieter came home from work early, for connecting some pipes.
I'd made the photos, so he too could see what they'd done.
What a muddy job!
By 15:15 they pulled the switch over and it started running!
This proved, that Pieter had correctly connected the electrical wiring!
The first water starts running out...
Still dirty water, for several hours...
Pieter came home from work early, for connecting some pipes.
I'd made the photos, so he too could see what they'd done.