Our home once again needed a fresh paint...
We used the very same Benjamin Moore Golden Mist.
Last time done was in May of 2013...
A lot of intricate painting work needed to be done on all the Vintage Woodworks spindles, ginger bread and trimmings. Painters Stanley Jessup and Randy Slaughter did a great job.
So after having it pressure washed on November 16, the painters finally started on November 29...
Our Interlock Metal Roofing, Interlock® Aluminum Slate in Aged Copper looks very nice as it is protected for a lifetime by AlunarⓇ embedded with TEFLONⓇ surface protector for ultimate durability and protection. See links of previous post below.
Above photo is taken under our Magnolia Grandiflora, which is now trimmed up and allows for a much nicer view of the home.
Since we'd requested the painters already in April of 2021, Pieter started doing preparations prior to their job... The lowest step, coming down from the gazebo into the garden was broken.
To the right, it is still missing its fulcrum on the left (only a brick) and right. This was on May 16, 2021.
Notice to the top left how the underside of the gazebo used to be white...
And yes, we removed all the boxwoods as they'd become rather lanky after 30 years.
When Pieter took this photo on January 9, of course, Spooky boy wanted to go with him.
Here the left and right fulcrums are clearly visible and the underpart is in Benjamin Moore Golden Mist, just like our home.
To the left you also see a brick for support, just in case...
Pieter took this photo from the side and back of our freshly painted home.
Taken on January 9, as well.
You can see where the newly
DOORBRIM added (next to the chimney is visible ←click on link).This photo shows more of the area to the left, where the retainer wall curves alongside our driveway.
Pieter did paint the retainer wall himself, after we had the fiberglass window boxes removed and placed inside the garage, out of the way for ladders and such.
You also see the bare spot where the huge live oak tree once stood near the chimney.
We got that first done...
This photo got taken on January 17, from the neighbor's lot over our vinyl picket fence.
The Japanese magnolia is already opening its buds; two are fully open!
And that with frost coming our way this week...
Both of us are so happy to have this mega task once more DONE!
It took forever till January 6, as it was raining on and off.
Yesterday, January 19, EXCEED Wash Solutions LLC cleaned the tiled patio near the Rose Suite entrance as well as the Rose Arbor.
You also can see the newly added DOORBRIM above Rose Suite's entrance door, see previous post below.
The Rose Stepping Stones got repainted by Pieter and are ready to be laid, once we have grass growing where the huge live oak tree once was.
Also yesterday, EXCEED Wash Solutions LLC cleaned our driveway as there were marks from the heavy equipment, used by the crew from 🌳BUCKEYE PREFERRED SERVICES LLC when cutting down and trimming our trees.
The orange cord visible, is from two long extension cords connected for Pieter being able to work on the underbrush with his electric chain saw, alongside the creek in our wood garden.
Looking neat and clean, all the way to the road.
This is our majestic Magnolia Namnetensis Flore Pleno to the right.
EXCEED Wash Solutions LLC also took care of our garage tiles.
So all the signs from different mega tasks have been 'erased' and the Vedder Estate looks nice!
Pieter's electric chain saw is visible in his hand wagon.
Related link: